Five new high-efficiency boilers, a bespoke flue system and carefully coordinated installation ensure reliable heating performance with minimal disruption for occupants.
Snapshot
Client: Hurstwood Holding
Site: Sir Christopher Harding House, North Shore Road, Whitehaven, CA28 6AX
Sector: Commercial Property
CBFM Solution: Boiler Plant Replacement & Mechanical Installation Services
Key Project Statistics
- Replacement of 4 existing Ideal Concord boilers
- Installation of 5 new Ideal Evo Max 2 boilers
- Total installed heating capacity: 500kW
- New low-loss header installed.
- Magnetic filtration incorporated into the system
- New flue system designed and installed.
- Completed within an occupied, operational building environment.
Client Introduction
Hurstwood Holding required a complete heating plant upgrade at Sir Christopher Harding House in Whitehaven. As an occupied commercial building with regular staff activity, maintaining building operations throughout the works was a critical priority.
The project called for the replacement of an ageing boiler installation with a modern, efficient heating solution capable of meeting the building’s ongoing heating demands while improving system reliability.
Guidance on delivering works safely in live environments: https://www.hse.gov.uk/construction/
Why Organisations Choose CBFM
From commercial offices and public buildings to industrial facilities and multi-site estates, CBFM provides practical engineering solutions that balance performance, safety, and operational requirements.
Learn more about CBFM: https://cbfmheating.co.uk/about-us-facilities-maintenance-north-east/
The Problem
The existing installation comprised four Ideal Concord boilers which required replacement to ensure continued heating performance and operational reliability.
However, this was far more than a straightforward boiler replacement.
The project required:
- Removal of the existing four-boiler arrangement
- Installation of a new five-boiler cascade system
- Design and installation of a completely new flue system
- Integration of a low-loss header and magnetic filtration
- Delivery of works within a live, occupied building environment
One of the project’s biggest challenges was maintaining safe building operations throughout the installation.
Staff continued to occupy and access the building while works progressed, meaning installation activities had to be carefully coordinated around daily operations.
“The works therefore had to be carefully planned and coordinated around staff movements and the day-to-day operation of the building, while managing the installation activities safely and minimising disruption.”
Before: The original four Ideal Concord boilers and existing plantroom.

During works: Removal of the old boilers and progress of the installation.

Installation and equipment: The five Ideal Evo Max 2 boilers, low-loss header, magnetic filter, and new flue system.


The Solution
CBFM developed a replacement strategy that not only upgraded the plant equipment but also improved the overall heating infrastructure for the site.
Installation Scope
The completed works included:
- Removal of 4 existing Ideal Concord boilers
- Installation of 5 new Ideal Evo Max 2 boilers
- Installation of a low-loss header
- Addition of a magnetic filter for improved system protection
- Design and installation of a new flue system
- Coordination of works around live building operations.
The move from a four-boiler arrangement to a five-boiler cascade configuration provided improved flexibility and resilience while supporting the building’s heating requirements.
CBFM carefully sequenced the installation programme to minimise disruption and maintain safe access throughout the project.
“The works were planned and coordinated around the building’s ongoing use, taking account of staff coming and going to help minimise disruption to day-to-day activities.”
Industry best practice for heating system design and building services engineering: https://www.cibse.org
Need support for a live-site refurbishment?
Whether you are replacing boilers, upgrading plantrooms, or delivering complex mechanical works, CBFM has experience working safely within occupied environments. View our services here: https://cbfmheating.co.uk/our-services/
The Results
The completed project delivered a modern, efficient heating installation capable of supporting the building’s ongoing operational needs.
Increased System Capacity and Resilience
The new installation incorporated five Ideal Evo Max 2 boilers, providing a total installed capacity of 500kW and creating a more flexible heating arrangement than the original system.
Enhanced System Protection
The addition of magnetic filtration helps protect system components by capturing debris and contaminants that can reduce performance and increase maintenance requirements.
Improved Plantroom Infrastructure
The new low-loss header and bespoke flue system ensure effective hydraulic separation and safe, reliable operation of the upgraded heating installation.
Successful Delivery Within a Live Environment
Most importantly, the project was completed while accommodating ongoing staff movements and day-to-day building operations.
This required careful communication, planning and coordination throughout the programme.
Demonstrated Project Management Expertise
The successful delivery reflects CBFM’s ability to manage complex mechanical installations within occupied buildings where health, safety and operational continuity remain essential.
Independent guidance on improving heating efficiency and reducing energy consumption in buildings: https://energysavingtrust.org.uk
Conclusion
The Sir Christopher Harding House project demonstrates CBFM’s capability to deliver major heating infrastructure upgrades within challenging operational environments.
By replacing an ageing four-boiler installation with a modern five-boiler system, incorporating magnetic filtration, a low-loss header, and a newly designed flue arrangement, CBFM provided a future-ready heating solution while ensuring the building remained operational throughout the works.
The project highlights the importance of detailed planning, effective communication and technical expertise when delivering mechanical upgrades in occupied buildings.
For building owners, facilities managers and property managers facing similar challenges, early engagement with experienced contractors can help minimise disruption while maximising project outcomes.
Ready to Upgrade Your Building Services?
Whether you are replacing end-of-life boilers, planning a plantroom refurbishment, or improving energy efficiency across your estate, CBFM can help.
- Commercial Heating Installations
- Boiler Replacement Projects
- Mechanical Engineering Services
- Planned Refurbishments
- Facilities Management Support
Contact CBFM today to discuss your next project:
https://cbfmheating.co.uk/cbfm-contact/
Menu
Contact
CBFM Heating
Unit A1, The Avenues,
Eleventh Avenue North
Team Valley Trading Estate,
Gateshead,
Tyne & Wear
NE11 ONJ
Social media

Boiler replacement
Need a new boiler?
Any boiler needs to be efficient and suitable for your home situation. We can recommend the best type of boiler from leading brands that come with long warranties, low running costs and high levels of efficiency. A combi gas boiler installation is the benchmark for efficiency, often with smart controls like Economy settings and an ability to link to smart devices like phones for voice control.
Benefits
- Award- winning, A-rated boilers
- Up to 10 years parts & labour warranty
- Smart thermostat included
- Local, Gas Safe registered engineers
- Instant no-obligation quote
Home cover plans
Plans to keep your mind at ease
We rely on our central heating to keep us warm, so having a boiler you can rely on is extremely important to most homeowners and business owners from our base in Gateshead, where we please clients across the North East.
Benefits
- Annual boiler service
- 24/7 emergency helpline
- Parts and labour included
- Network of approved engineers
- Unlimited callouts for breakdowns & repairs